Summary
The aging River Road bridge in New Baltimore is being replaced under the federal bridge program. A. Colarusso & Sons won the $2.74 million contract, with CDM Smith handling inspection.
At a glance
- Total mentions
- 9
- Last 30 days
- 1
Rising — discussed at 3 meetings since Sep 14, 2026, up from 2 in the two months before.
Impact analysis
About $3.1 million total, largely federal and locally funded through Capital Project #125.
New Baltimore and River Road travelers get a safe, modern bridge.
None identified.
Mentions & discussions (9)
Public Works - Committee Meeting — October 13, 2026
Contractors are finishing drainage work on 23B after July's ten-inch rainstorm, then moving to the final slope stabilization on Snake Road, with repaving expected this season. A section of Green Lake Road was added to the drainage scope after the flood.
Greene County Legislature - Regular Legislature Meeting No. 9 — September 16, 2026
The county is paying for work on several bridges and roads — including $661,313 for Route 23B slope stabilization, a $44,016 culvert repair on Route 67 in Greenville, and extra engineering on the Main Street, Leeds rehab project.
Public Works - Committee Meeting — September 14, 2026
The Main Street project ran behind due to sheet-pile installation, but work is back on track with a mid-to-late October target. A $13,500 camera inspection of the drainage pipe could save big money by lining rather than replacing it.
Greene County Legislature - Regular Legislature Meeting No. 7 — July 15, 2026
The county accepted an engineering proposal to fix the failing Willowbrook Road culvert over Cob Creek in Greenville under its emergency 'Red Flag' program.
Finance - Committee Meeting — July 13, 2026
The county will spend up to $24,250 on engineering for emergency repairs to the failing Willowbrook Road culvert over Cob Creek in Greenville.
Public Works - Committee Meeting — July 13, 2026
Bridge and culvert work is underway across the county: Route 61 in Coxsackie is on schedule, Prattsville's Route 2 culvert should finish in six to eight weeks, and the Jefferson Heights Route 23B slope project is running behind due to stump removal.
Greene County Legislature - Regular Legislature Meeting No. 6 — June 17, 2026
The county committed $3.15 million to start replacing the County Route 61 bridge over Coxsackie Creek, with the feds and state picking up 80%. Construction affects commuters in the Coxsackie area.
Greene County Legislature - Regular Legislature Meeting No. 5 — May 20, 2026
The Legislature poured money into roads and bridges: a $355,222 culvert replacement in Prattsville, a $23,130 Hunter bridge repair, bid ads for a Halcott culvert, plus paving, stone, materials, and fuel contracts and three new plow trucks costing $940,844.
Greene County Legislature - Regular Legislature Meeting No. 3 — March 18, 2026
The aging River Road bridge in New Baltimore is being replaced under the federal bridge program. A. Colarusso & Sons won the $2.74 million contract, with CDM Smith handling inspection.
We'll email you when it's on an upcoming agenda and when it's voted on, at most once a day.
The weekly brief for Greene County
What the council decided, in plain English — one email a week.
Free. Unsubscribe with one click any time. We never sell your email.